Building Construction Technology Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. High temperature:

2 / 30

2. Which of the following statements is true:

3 / 30

3. Select the most correct statement.

4 / 30

4. The cut or broken portion of a brick is called:

5 / 30

5. Grading of sand causes great variation in:

6 / 30

6. The vertical member provided at the top and bottom ends of a flight supporting the handrail is:

7 / 30

7. From an earthquake safety perspective, the floor-to-floor wall height of the building should be?

8 / 30

8. Curing period is minimum for concrete using:

9 / 30

9. The alignment of a cross joint along the plumb line is:

10 / 30

10. Concrete mixer is:

11 / 30

11. Formwork suitable for construction work:

12 / 30

12. Black cotton soil is unsuitable for foundations because of its:

13 / 30

13. The brick laid with its breadth parallel to the face of a wall is known as:

14 / 30

14. An excess of flaky particles in concrete aggregates:

15 / 30

15. The process of hand compaction of concrete is:

16 / 30

16. The termination of the unfinished wall in a stepped fashion is known as:

17 / 30

17. If sea water is used for preparing concrete:

18 / 30

18. At the freezing point of water, concrete:

19 / 30

19. If the fineness modulus of sand is 2.5, it is graded as:

20 / 30

20. Cement provides strength, durability, and water-tightness to concrete because:

21 / 30

21. The bond filled with 4 bats and 1Γüä2 closer with the regular header and stretcher is known as:

22 / 30

22. Which of the following is not a tool used in laying a brick wall?

23 / 30

23. A wooden block hinged on the post outside a door is known as:

24 / 30

24. The maximum height of a masonry wall generally done in one day is:

25 / 30

25. Depth of foundation is determined by:

26 / 30

26. Higher workability of concrete is required if the structure is:

27 / 30

27. Horizontal construction joints in concrete walls are generally provided at:

28 / 30

28. Under strap footing, individual footings are connected by:

29 / 30

29. The cement-sand mortar preferred in load-bearing walls is:

30 / 30

30. The foundations are placed below ground level to increase:

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Join Discussionsx
()
x
Scroll to Top