Home» Online Test » Civil Engineering » Building Construction Technology Online Test » Paper 1 » Paper 2 » Paper 3 0% Sorry, time's up. To complete the online test, please restart it. Created by Vikash chaudhary This is a FREE online test. Beware of scammers who ask for money to attend this test. Get fresh, new questions in each attempt. Total Questions: 30 Time Allotted: 30 minutes Passing Score: 50% Randomization: Yes Certificate: No Do not refresh the page! 👍 All the best! 1 / 30 1. Water-cement ratio is generally expressed in the volume of water required per: a) 10 kg b) 20 kg c) 50 kg d) 40 kg 2 / 30 2. For concreting of tunnel linings, transportation of concrete is done by: a) Pans b) Wheelbarrows c) Containers d) Pumps 3 / 30 3. The termination of the unfinished wall in a stepped fashion is known as: a) toothing b) pointing c) racking back d) jointing 4 / 30 4. Slump test is a measure of: a) tensile strength b) compressive strength c) impact value d) consistency 5 / 30 5. The process of hardening the concrete by keeping its surface moist is known as: a) placing b) wetting c) curing d) compacting 6 / 30 6. The compaction of concrete improves: a) Density b) Strength c) Durability d) All of the above 7 / 30 7. High temperature: a) Increases the strength of concrete b) Decreases the strength of concrete c) No effect on the strength of concrete d) None of the above 8 / 30 8. A gate (door) without importance is: a) Battened & ledged door b) Battened, ledged & braced door c) Battened, ledged & framed door d) None of the above 9 / 30 9. The process of hand compaction of concrete is: a) Same as machine compaction b) Better than machine compaction c) Inferior to machine compaction d) All of the above 10 / 30 10. The addition of pozzolana to cement causes: a) Increased curing time b) Less heat of hydrogen c) Reduced permeability d) All of the above 11 / 30 11. Pick up the correct statement from the following: a) Admixtures accelerate hydration b) Admixtures make concrete water-proof c) Admixtures make concrete acid-proof d) All of the above 12 / 30 12. The maximum height of a masonry wall generally done in one day is: a) 0.5 m b) 1 m c) 1.5 m d) 2 m 13 / 30 13. Lap is the horizontal distance between the vertical joints in: a) stone masonry b) brick masonry c) both of the above d) none of the above 14 / 30 14. A through stone should be provided in a stone masonry at a distance not exceeding: a) 3.0m b) 2.5m c) 2.0m d) 1.5m 15 / 30 15. Percentage of pozzolanic material containing clay up to 80% used for the manufacture of pozzolana cement is: a) 30% b) 40% c) 50% d) 60% 16 / 30 16. The vertical member running through the middle of a shutter frame is: a) Style b) Reveal c) Mullion d) Post 17 / 30 17. The concrete mix which causes difficulty in obtaining a smooth finish is known to possess: a) Segregation b) Internal friction c) Hardness d) Bleeding 18 / 30 18. Water-cement ratio is: a) volume of water to that of cement b) weight of water to that of cement c) volume of concrete to that of water d) both (a) and (b) of the above 19 / 30 19. For a given water content, workability decreases if the concrete aggregates contain an excess of: a) thin particles b) flat particles c) elongated particles d) all of the above 20 / 30 20. The course of stone placed immediately below the cornice along the face of the wall is: a) frieze b) corbel c) arrise d) cornice 21 / 30 21. The approximate ratio of strength of cement concrete at 3 months to that at 28 days of curing is: a) 1.15 b) 1.3 c) 1 d) 0.75 22 / 30 22. Slump used for beam & slab for RCC: a) 0-25 b) 25-50 c) 50-100 d) 100-150 23 / 30 23. The method of damp proofing in which a layer of water repellent substance is provided between the source of dampness and part of the structure, adjacent to it is known as: a) membrane damp proof b) integral damp proof c) guiniting d) surface treatment 24 / 30 24. The roof sloping in two directions is called: a) Hipped roof b) Gambrel roof c) Flat roof d) Mansard roof 25 / 30 25. Sukhi is added to lintel mortar to: a) Prevent shrinkage b) Impact hydraulicity c) Increase bulk d) Decrease setting time 26 / 30 26. The arrangement made to support an unsafe structure temporarily is known as: a) shoring b) scaffolding c) underpinning d) jacking 27 / 30 27. Damp proofing course is done: a) Along the walls of the building b) Along the floors of the building c) Along the walls and floor of the building d) Along the walls, beams, and floor of the building 28 / 30 28. The approximate ratio of strength of cement concrete at 1 year to that at 28 days of curing is: a) 1.15 b) 1.3 c) 1 d) 0.75 29 / 30 29. The safe bearing capacity of a soil can be defined as: a) ultimate load on the bearing area b) safe load on the bearing area c) load intensity beyond which the soil should not be loaded d) load intensity at which the soil fails 30 / 30 30. The vertical side member of a shutter frame is known as: a) Style b) Reveal c) Mullion d) Post Please provide accurate information so we can send your Achievement Certificate by mail. NameEmailPhone Number Your score is Share your achievement! LinkedIn Facebook Twitter 0% Restart Test Please provide your feedback. Thank you for your valuable feedback. Send feedback Buy Building Construction Technology MCQ PDF for Offline Study