Building Construction Technology Online Test - Paper 2
GKaim: Measure | Improve | Achieve

Building Construction Technology Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. The datum temperature for maturity by Plowman is:

2 / 30

2. Too wet concrete may cause:

3 / 30

3. The structure on which an arch rests is called:

4 / 30

4. Minimum water-cement ratio required for full hydration of cement:

5 / 30

5. In made-up ground having a low value of bearing power, heavy concentrated load is generally supported by:

6 / 30

6. The thickened portion of a masonry wall is called:

7 / 30

7. The maximum bearing capacity of soil is that of:

8 / 30

8. The joint preferred in a single brick wall to save facing bricks is:

9 / 30

9. Practically which one is not concerned with w/c ratio in the construction industry:

10 / 30

10. Flooring preferred for a dancing hall is:

11 / 30

11. The foundation in which a cantilever beam is provided to join two footings is known as:

12 / 30

12. The concrete mix which causes difficulty in obtaining a smooth finish is known to possess:

13 / 30

13. Negative skin friction on piles:

14 / 30

14. As compared to english bond, the double flemish bond is:

15 / 30

15. Cement used for resisting acid is:

16 / 30

16. The filling in cavities with cement slurry is known as:

17 / 30

17. Grading of sand causes great variation in:

18 / 30

18. The roof covering preferred for a large span is:

19 / 30

19. When D.P.C. is to be laid over large areas, the material preferred is:

20 / 30

20. Sedimentation analysis is based on the assumption:

21 / 30

21. The roof sloping in four directions is called:

22 / 30

22. Horizontal construction joints in concrete walls are generally provided at:

23 / 30

23. The soundness test of cement by Le Chatelier's apparatus gives unsoundness due to:

24 / 30

24. Which sequence is correct with respect to the removal of formwork?

25 / 30

25. Water-cement ratio by weight is:

26 / 30

26. Which one of the following is not a source of dampness in walls and floors:

27 / 30

27. The vertical member fixed between steps and handrail is known as:

28 / 30

28. The approximate ratio of strength of cement concrete at 6 months to that at 28 days of curing is:

29 / 30

29. The bond filled with 4 bats and 1Γüä2 closer with the regular header and stretcher is known as:

30 / 30

30. For a given water content, workability decreases if the concrete aggregates contain an excess of:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top