Building Construction Technology Online Test - Paper 2
GK Aim: A Treasure of MCQs

Building Construction Technology Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Water-cement ratio is generally expressed in the volume of water required per:

2 / 30

2. For concreting of tunnel linings, transportation of concrete is done by:

3 / 30

3. The termination of the unfinished wall in a stepped fashion is known as:

4 / 30

4. Slump test is a measure of:

5 / 30

5. The process of hardening the concrete by keeping its surface moist is known as:

6 / 30

6. The compaction of concrete improves:

7 / 30

7. High temperature:

8 / 30

8. A gate (door) without importance is:

9 / 30

9. The process of hand compaction of concrete is:

10 / 30

10. The addition of pozzolana to cement causes:

11 / 30

11. Pick up the correct statement from the following:

12 / 30

12. The maximum height of a masonry wall generally done in one day is:

13 / 30

13. Lap is the horizontal distance between the vertical joints in:

14 / 30

14. A through stone should be provided in a stone masonry at a distance not exceeding:

15 / 30

15. Percentage of pozzolanic material containing clay up to 80% used for the manufacture of pozzolana cement is:

16 / 30

16. The vertical member running through the middle of a shutter frame is:

17 / 30

17. The concrete mix which causes difficulty in obtaining a smooth finish is known to possess:

18 / 30

18. Water-cement ratio is:

19 / 30

19. For a given water content, workability decreases if the concrete aggregates contain an excess of:

20 / 30

20. The course of stone placed immediately below the cornice along the face of the wall is:

21 / 30

21. The approximate ratio of strength of cement concrete at 3 months to that at 28 days of curing is:

22 / 30

22. Slump used for beam & slab for RCC:

23 / 30

23. The method of damp proofing in which a layer of water repellent substance is provided between the source of dampness and part of the structure, adjacent to it is known as:

24 / 30

24. The roof sloping in two directions is called:

25 / 30

25. Sukhi is added to lintel mortar to:

26 / 30

26. The arrangement made to support an unsafe structure temporarily is known as:

27 / 30

27. Damp proofing course is done:

28 / 30

28. The approximate ratio of strength of cement concrete at 1 year to that at 28 days of curing is:

29 / 30

29. The safe bearing capacity of a soil can be defined as:

30 / 30

30. The vertical side member of a shutter frame is known as:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top