Home» Online Test » Civil Engineering » Surveying Online Test » Paper 1 » Paper 2 » Paper 3 0% Sorry, time's up. To complete the online test, please restart it. Created by Vikash chaudhary This is a FREE online test. Beware of scammers who ask for money to attend this test. Get New Questions in Each Attempt Total Questions: 50 Time Allotted: 50 minutes Passing Score: 70% Randomization: Yes Certificate: Yes Do not refresh the page! 👍 All the best! 1 / 50 1. The types of instrument generally used in the survey of gravity water supply system are: a) abney level b) dumpy level c) theodolite d) clinometer 2 / 50 2. The instrument used to reproduce plans to a different scale is called a) planimeter b) clinometer c) ghat tracer d) pentagraph 3 / 50 3. The resection by a two-point problem as compared to the three-point problem: a) requires more labor b) takes less time c) gives more accurate results d) none of the above 4 / 50 4. Find the contour interval for the map, 1: 25000 in IS & FPS a) 4m & 20.70ft b) 6m & 19.70ft c) 3m & 20.70ft d) 5m & 19.70ft 5 / 50 5. The multiplying constant of a tacheometer is a) f/d b) f/I c) f(i+d) d) none of the above 6 / 50 6. Which of the following instruments is generally used for baseline measurements? a) metallic tape b) steel tape c) invar tape d) chain 7 / 50 7. If the staff is held vertical and the angle of elevation and depression are kept the same, then the horizontal distance between the instrument and staff station computed by observation will be a) greater at an angle of elevation b) greater at an angle of depression c) same in both cases d) none of the above 8 / 50 8. The whole circle bearing 338°42" converted into quadrantal form is given as a) N 21°18' W b) S 21°18' E c) W 21°18' N d) none of the above 9 / 50 9. The difference between the two bearings of the last line as observed at the first and the last station of a traverse is known as a) angular closing error b) closing error in bearing c) relative closing error d) none of the above 10 / 50 10. Tellurometer uses a) light waves b) radio waves c) infra waves d) all of the above 11 / 50 11. A benchmark (BM) is a a) point of known elevation b) reference point c) the first station d) the last station 12 / 50 12. Level surface is parallel to a) horizontal surface b) vertical surface c) datum surface d) none of the above 13 / 50 13. The theory of probability is applied to a) cumulative errors b) compensative errors c) accidental errors d) none of the above 14 / 50 14. The image of the objectives formed should lie a) at the eyepiece b) in the plane of cross hairs c) at the center of the eyepiece d) at the optical center of the eyepiece. 15 / 50 15. The fundamental lines of transit of the theodolite are a) horizontal axis and line of collimation b) vertical axis c) axes of plate levels and bubble line of the telescope level d) all of the above 16 / 50 16. In the case of leveling staff readings are taken by (In the case of target staff) a) staff man b) instrument man c) both (a) and (b) of above d) none of the above 17 / 50 17. A level tube is used to make the line of sight horizontal. It is filled with a) ether b) chloroform c) synthetic alcohol d) all of the above 18 / 50 18. If the sum of northing of a traverse exceeds the sum of southing by 2m and the sum of easting exceeds the sum of westing by 2m, the resulting closing error will be a) √2 m b) 2√2 m c) 2m d) 4m 19 / 50 19. The graduations in a prismatic compass are a) inverted and run clockwise having 0° at north b) inverted and run clockwise having 0° at south c) are erect d) none of the above 20 / 50 20. The smaller angle which a survey line makes with the true meridian is known as a) altitude b) azimuth c) declination d) dip 21 / 50 21. The projection of a line on a plane perpendicular to the meridian is known as a) parallax b) aberration c) latitude d) departure 22 / 50 22. Automatic level has advantages of a) high precision and external influence b) freedom from errors and external influence c) comfortable and has a large range of application d) all of the above 23 / 50 23. If the magnetic bearing of the sun at noon at a place in the southern hemisphere is 150°, the magnetic declination at that place is a) 30°E b) 30°W c) 20°E d) 20°W 24 / 50 24. The foremost work to be executed while traversing with a compass is a) marking and referencing of stations b) running survey lines c) picking up of details d) reconnaissance 25 / 50 25. The height of instrument method is a) less tedious b) more rapid c) includes less calculation d) all of the above 26 / 50 26. For a dumpy level in perfect adjustment, the horizontal cross hair should be in a plane a) perpendicular to the vertical axis b) parallel to the vertical axis c) parallel to the axis of the bubble tube d) none of the above 27 / 50 27. The best method of interpolation of contours in the direct method of contouring is by a) computations b) interpolation c) estimation d) none of the above 28 / 50 28. An imaginary line lying through the surface of the ground, having a constant inclination to the horizontal, is known as a) contour line b) contour gradient c) contour interval d) horizontal equivalent 29 / 50 29. The process of turning the telescope about the vertical axis in a horizontal plane is known as a) reversing b) transiting c) plunging d) swinging 30 / 50 30. The observed reading on a leveling staff was 3.525 m. If the staff was 0.125m off from the original ground level, what should be the correct reading? a) 3.65m b) 3.525m c) 3.4m d) all of the above 31 / 50 31. The limiting length of an offset does not depend upon a) accuracy of the work b) method of setting out perpendiculars c) scale of plotting d) indefinite features to be surveyed 32 / 50 32. The bearing of the traverse line is calculated by a) included angle method b) deflection angle method c) both (a) and (b) of above d) none of the above 33 / 50 33. If the needle of the compass is sluggish the type of error will be a) instrumental error b) personal error c) natural error d) none of the above 34 / 50 34. The central angle subtended by an arc of 30m of the curve a) 573/R b) 1146/R c) 1718.9/R d) 3435/R 35 / 50 35. The position of a point can be fixed more accurately by a) perpendicular offset b) optical square c) prism square d) oblique offsets 36 / 50 36. Angular surveying in which both the horizontal and vertical positions of a point are obtained by optical means is known as a) tacheometry b) hydrography c) topography d) all of the above 37 / 50 37. *The radius of curvature of the arc of the bubble tube is generally kept a) 10 m b) 25 m c) 50 m d) 100 m 38 / 50 38. Two contour lines, having the same elevation a) can't cross each other b) can cross each other c) can't unite together d) can unite together 39 / 50 39. The direct method of contouring is a) very slow method b) most accurate method c) suitable for contouring a small area d) all of the above 40 / 50 40. The tie line is run through the survey to a) take off sets for detailed surveying b) take details of nearby objects c) check accuracy of work d) all of the above 41 / 50 41. The location of the contour gradient for a highway is best set out from a) ridge down the hill b) saddle down the hill c) bottom to the ridge d) bottom to the saddle 42 / 50 42. The Bench Mark of a point is 400m. Backsight reading at the benchmark is 2.20, and the foresight reading of point A is 2.10. Find the RL of point A a) 400.00m b) 402.20m c) 402.10m d) 400.10m 43 / 50 43. The permissible limits of error in chaining for measurement on rough or hilly ground are a) 1:2000 b) 1:1000 c) 1:500 d) 1:250 44 / 50 44. The types of errors that are of a cumulative nature and can be corrected are known as a) permissible error b) residual error c) expected error d) systematic error 45 / 50 45. In leveling, the station where the back sight and foresight readings are taken is known as a) change point b) fixed point c) movable point d) none of the above 46 / 50 46. The types of survey in which fieldwork and plotting proceed simultaneously are: a) plane table b) compass c) leveling d) tacheometric 47 / 50 47. Offset angle taken in chain survey may be a) 45° b) 90° c) 135° d) any of the above 48 / 50 48. The RL of the benchmark is 1000.0 m, and the back sight reading at the benchmark is 2.555 m. Find the staff reading of IS if the RL of IS is 1000.055 m a) 2.555 m b) 2.5 m c) 3 m d) 0.0505 m 49 / 50 49. The difference between the sum of the measured angles and the theoretical sum of the angles of a closed traverse is called the a) angular closing error b) closing error in bearing c) relative closing error d) all of the above 50 / 50 50. The types of survey used to fix property lines are a) topographical b) cadastral c) city d) astronomical Please provide accurate information so we can send your Achievement Certificate by mail. NameEmailPhone Number Your score is Share your achievement! LinkedIn Facebook Twitter 0% Restart Test Please provide your feedback. Thank you for your valuable feedback. Send feedback Buy Surveying MCQ PDF for Offline Study Share the above MCQs: Click to share on Facebook (Opens in new window) Facebook Click to share on WhatsApp (Opens in new window) WhatsApp Click to share on X (Opens in new window) X Click to share on LinkedIn (Opens in new window) LinkedIn Click to share on Reddit (Opens in new window) Reddit