Surveying Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The types of instrument generally used in the survey of gravity water supply system are:

2 / 50

2. The instrument used to reproduce plans to a different scale is called

3 / 50

3. The resection by a two-point problem as compared to the three-point problem:

4 / 50

4. Find the contour interval for the map, 1: 25000 in IS & FPS

5 / 50

5. The multiplying constant of a tacheometer is

6 / 50

6. Which of the following instruments is generally used for baseline measurements?

7 / 50

7. If the staff is held vertical and the angle of elevation and depression are kept the same, then the horizontal distance between the instrument and staff station computed by observation will be

8 / 50

8. The whole circle bearing 338°42" converted into quadrantal form is given as

9 / 50

9. The difference between the two bearings of the last line as observed at the first and the last station of a traverse is known as

10 / 50

10. Tellurometer uses

11 / 50

11. A benchmark (BM) is a

12 / 50

12. Level surface is parallel to

13 / 50

13. The theory of probability is applied to

14 / 50

14. The image of the objectives formed should lie

15 / 50

15. The fundamental lines of transit of the theodolite are

16 / 50

16. In the case of leveling staff readings are taken by (In the case of target staff)

17 / 50

17. A level tube is used to make the line of sight horizontal. It is filled with

18 / 50

18. If the sum of northing of a traverse exceeds the sum of southing by 2m and the sum of easting exceeds the sum of westing by 2m, the resulting closing error will be

19 / 50

19. The graduations in a prismatic compass are

20 / 50

20. The smaller angle which a survey line makes with the true meridian is known as

21 / 50

21. The projection of a line on a plane perpendicular to the meridian is known as

22 / 50

22. Automatic level has advantages of

23 / 50

23. If the magnetic bearing of the sun at noon at a place in the southern hemisphere is 150°, the magnetic declination at that place is

24 / 50

24. The foremost work to be executed while traversing with a compass is

25 / 50

25. The height of instrument method is

26 / 50

26. For a dumpy level in perfect adjustment, the horizontal cross hair should be in a plane

27 / 50

27. The best method of interpolation of contours in the direct method of contouring is by

28 / 50

28. An imaginary line lying through the surface of the ground, having a constant inclination to the horizontal, is known as

29 / 50

29. The process of turning the telescope about the vertical axis in a horizontal plane is known as

30 / 50

30. The observed reading on a leveling staff was 3.525 m. If the staff was 0.125m off from the original ground level, what should be the correct reading?

31 / 50

31. The limiting length of an offset does not depend upon

32 / 50

32. The bearing of the traverse line is calculated by

33 / 50

33. If the needle of the compass is sluggish the type of error will be

34 / 50

34. The central angle subtended by an arc of 30m of the curve

35 / 50

35. The position of a point can be fixed more accurately by

36 / 50

36. Angular surveying in which both the horizontal and vertical positions of a point are obtained by optical means is known as

37 / 50

37. *The radius of curvature of the arc of the bubble tube is generally kept

38 / 50

38. Two contour lines, having the same elevation

39 / 50

39. The direct method of contouring is

40 / 50

40. The tie line is run through the survey to

41 / 50

41. The location of the contour gradient for a highway is best set out from

42 / 50

42. The Bench Mark of a point is 400m. Backsight reading at the benchmark is 2.20, and the foresight reading of point A is 2.10. Find the RL of point A

43 / 50

43. The permissible limits of error in chaining for measurement on rough or hilly ground are

44 / 50

44. The types of errors that are of a cumulative nature and can be corrected are known as

45 / 50

45. In leveling, the station where the back sight and foresight readings are taken is known as

46 / 50

46. The types of survey in which fieldwork and plotting proceed simultaneously are:

47 / 50

47. Offset angle taken in chain survey may be

48 / 50

48. The RL of the benchmark is 1000.0 m, and the back sight reading at the benchmark is 2.555 m. Find the staff reading of IS if the RL of IS is 1000.055 m

49 / 50

49. The difference between the sum of the measured angles and the theoretical sum of the angles of a closed traverse is called the

50 / 50

50. The types of survey used to fix property lines are

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top
0
Join Discussionsx
()
x