Surveying Online Test - Paper 3 » Winning Questions
GKaim: Measure | Improve | Achieve

Surveying Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimGKaim

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The curvature and refraction corrections applied to staff readings respectively are

2 / 50

2. The prismatic compass and the surveyor's compass respectively give

3 / 50

3. Right face and left face readings are taken to

4 / 50

4. Azimuth (direct angles) is an angle measured in

5 / 50

5. The accuracy required in precise leveling is of the order of (Where K is the total distance of the level line in KM)

6 / 50

6. In a survey, it was recorded that Σrise = 0, then

7 / 50

7. The types of leveling used for Geodetic survey is

8 / 50

8. The method most suitable for plotting in hilly areas is:

9 / 50

9. In the whole circle system, the bearings are measured

10 / 50

10. If the needle is truly magnetic and is not sluggish

11 / 50

11. Which of the following terms is not associated with leveling:

12 / 50

12. Methods adopted for traversing are

13 / 50

13. The surface of zero elevation around the earth, which is slightly irregular and curved, is known as

14 / 50

14. Tellurometer uses

15 / 50

15. A curve consists of two areas of different radii bending in the same direction and lying on the same side of their common tangent and their centers being on the same side of the curve is known as a

16 / 50

16. Obstacle to ranging but not chaining is

17 / 50

17. The place where the reading is taken is known as

18 / 50

18. "Fiducial edge" is the working edge of

19 / 50

19. The fundamental lines of transit of the theodolite are

20 / 50

20. It is more difficult to obtain good results while measuring the horizontal distance by the stepping method

21 / 50

21. For a line AB

22 / 50

22. A 30 m long chain when tested should not show errors exceeding

23 / 50

23. Handles are connected to the link by

24 / 50

24. The types of survey in which fieldwork and plotting proceed simultaneously are:

25 / 50

25. In the case of leveling staff readings are taken by (In the case of target staff)

26 / 50

26. Natural error in leveling is caused due to

27 / 50

27. Compensating errors in chaining or other surveys are

28 / 50

28. The benchmark of a station A is 500 m, and the back sight reading at the point A is 2 m & foresight reading of station B is 3 m. Find the RL of station B

29 / 50

29. Any arbitrarily assumed level line from which vertical distances are measured is known as

30 / 50

30. In the direct method of contouring, the process of locating points lying on a contour is known as

31 / 50

31. The Bench Mark of a point is 400m. Backsight reading at the benchmark is 2.20, and the foresight reading of point A is 2.10. Find the RL of point A

32 / 50

32. Personal error in leveling occurs due to

33 / 50

33. In a theodolite, staff readings for upper, middle, and lower crosshairs are 1.4, 0.9 & 0.4, respectively. If the height of the tower is 100m, then find the horizontal distance between the instrument station and the base of the tower

34 / 50

34. The angle which the true meridian makes with the magnetic meridian is called

35 / 50

35. The fix of the table is good when:

36 / 50

36. *The observed reading on a leveling staff was 3.545 m. If the staff was 0.150m off from the original ground level, what should be the correct reading?

37 / 50

37. Local attraction at a place may be due to

38 / 50

38. Working edge of alidade is called

39 / 50

39. Setting up the plane table consists of operations:

40 / 50

40. Angle of 45° with the chain line may be set out with

41 / 50

41. Direction of the closing error is given by

42 / 50

42. The designation of scale recommended by IS: 1491-1959 is

43 / 50

43. The foremost work to be executed while traversing with a compass is

44 / 50

44. The closing error is given by

45 / 50

45. *The correction for refraction is given by

46 / 50

46. *The radius of curvature of the arc of the bubble tube is generally kept

47 / 50

47. The principle of surveying to prevent the accumulation of errors is

48 / 50

48. The magnetic north is indicated by

49 / 50

49. The horizontal distances obtained by tacheometry are corrected for

50 / 50

50. The function of the leveling head is

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top