Irrigation Engineering Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. The method for training of rivers is

2 / 30

2. Weirs designed and constructed on Bligh's theory failed due to

3 / 30

3. Which of the following is a leguminous crop?

4 / 30

4. *When the canal runs below the drain, the cross drainage work provided is called

5 / 30

5. The upstream face of an earthen dam is

6 / 30

6. The operation during the infiltration of water below the ground surface is

7 / 30

7. Darcy's formula is given by

8 / 30

8. The mean velocity, for a channel of given depth, which will just keep the channel free from silting or scouring its bed throughout the year, is called

9 / 30

9. Cross walls provided across the stream, built under the floor of a hydraulic structure at the upstream and downstream ends of the pavement to avoid scour and protect floors, abutments etc., and which is carried up to another, is called

10 / 30

10. Hydrodynamic pressure due to an earthquake acts at a height of

11 / 30

11. A low gravity dam is the one in which

12 / 30

12. *Lime concrete lining is used

13 / 30

13. *A silt regulator located at the head of a channel is called

14 / 30

14. Optimum depth of kor watering for a rice crop is

15 / 30

15. *River training for depth is achieved by

16 / 30

16. The water utilized by plants is available in soils mainly in the form of

17 / 30

17. The supply passing down the parent channel is controlled by

18 / 30

18. On a suitable foundation, the earthen dam can be constructed up to a height of

19 / 30

19. *Diversion headwork is constructed to

20 / 30

20. The type of irrigation during a low quantity of water

21 / 30

21. The kharif crop is sown

22 / 30

22. Vertical acceleration due to an earthquake results in

23 / 30

23. *Mean velocity of the canal should never be

24 / 30

24. A straight glacis type fall with a baffle platform and a baffle wall is called

25 / 30

25. SHAFT spillway is the same as

26 / 30

26. With respect to inlet and outlet, which one is correct?

27 / 30

27. Waterlogging may result from

28 / 30

28. An excavation in the base of a dam or other structures filled with relatively impervious material to reduce percolation is called

29 / 30

29. Percolation loss is less in the case of

30 / 30

30. *The discharge in an open channel is inversely proportional to

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top