Irrigation Engineering Online Test - Paper 2 » Smart Exam
GKaim: Measure. Improve. Achieve.

Irrigation Engineering Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. In an earthen dam, seepage through the foundation is controlled by providing

2 / 30

2. Siltation of a reservoir can be reduced by

3 / 30

3. The minimum size of the stone that will remain at rest in a channel of longitudinal slope, S, and hydraulic mean depth, R, is given by

4 / 30

4. The discharge coefficient of an ogee spillway is:

5 / 30

5. The angle between the head regulator and the water, for smooth entry of water into a canal, is generally kept at

6 / 30

6. *The hydraulic jump is known as

7 / 30

7. The necessity of irrigation is required due to

8 / 30

8. Canals taking off from a river with or without a head regulator are called

9 / 30

9. *The process by which unculturable soil made culturable is known as

10 / 30

10. In an ion exchange process when ions are transported from water to solid, ion-exchange media is fixed or fluidized bed, the process is termed as

11 / 30

11. For an earthen dam, least suited spillway is:

12 / 30

12. With respect to inlet and outlet, which one is correct?

13 / 30

13. Area velocity method is used to measure.

14 / 30

14. *Single bank canal is the other name for

15 / 30

15. Boulder lining is useful where

16 / 30

16. *Critical depth is

17 / 30

17. Critical flow is

18 / 30

18. A canal normally used for the diversion of floodwaters of a river is

19 / 30

19. Whenever an embankment has to be built on unreliable soil, provision is made for

20 / 30

20. The methods used for drilling a tube well in compacted rock materials is

21 / 30

21. *If the irrigation canal and drain are at the same level, the cross drainage work is achieved by providing

22 / 30

22. Percolation loss is less in the case of

23 / 30

23. Crop water is proportional to

24 / 30

24. In a gravity weir, the uplift pressure is resisted by

25 / 30

25. The ratio of the total volume of water delivered to a crop to the area on which it has been spread is called

26 / 30

26. *A diversion head work is constructed to

27 / 30

27. Boron concentration in water for irrigation should be limited to

28 / 30

28. The type of irrigation during a low quantity of water

29 / 30

29. A canal which is aligned at right angles to the contour is called

30 / 30

30. *Mean velocity of the canal should never be

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top