Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Slack time in PERT analysis:

2 / 30

2. Inspection of construction works for quality control is carried out and covers:

3 / 30

3. When the times of earliest finish and the latest finish are equal in an operation, the operation is called:

4 / 30

4. A project is:

5 / 30

5. In PERT analysis, the actual performance of the task is known as:

6 / 30

6. Whenever an activity has zero total float, then:

7 / 30

7. When all the paths are arranged according to the descending order of the float, the path which is next to the critical path is known as:

8 / 30

8. Tender documents do not contain:

9 / 30

9. Gantt chart indicates:

10 / 30

10. Aggregate planning is planning for:

11 / 30

11. The dual-role event is:

12 / 30

12. In a CPM/PERT network, the number of events is:

13 / 30

13. PERT is:

14 / 30

14. Free float is the:

15 / 30

15. Type of organization used in the construction industry is:

16 / 30

16. CPM adopts:

17 / 30

17. Direct cost of a project is due to:

18 / 30

18. The independent float affects only:

19 / 30

19. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

20 / 30

20. The square root of the variance is known as:

21 / 30

21. Completion of an activity on the CPM network diagram is generally known as:

22 / 30

22. Negative slack occurs:

23 / 30

23. Total project cost:

24 / 30

24. A stage or point where all previous jobs merging in it are completed and all further jobs bursting out are still to be completed is known as:

25 / 30

25. An EPC contract means:

26 / 30

26. The duration of time which an activity can be delayed without affecting the succeeding activity is called free float which affects only:

27 / 30

27. Milestone charts are developed in:

28 / 30

28. Which of the following techniques is advanced and more indicative in modern construction progress review?

29 / 30

29. Insurance provision in GCC is applicable for:

30 / 30

30. The reduction in project time normally results in:

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top
0
Join Discussionsx
()
x