Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. A fictitious activity with zero duration and no cost used to maintain the sequential order of the activities in the network is known as a:

2 / 30

2. Line of balance technique is used for:

3 / 30

3. In CPM:

4 / 30

4. In PERT, the most likely time is:

5 / 30

5. If the height of the frequency-distribution underneath it is equal to unity, then the curve is known as:

6 / 30

6. For completion of a project, the critical path of the network represents:

7 / 30

7. At an event other than the final event, if no activity emerges, it results in an error called:

8 / 30

8. The term CPM in construction management is an abbreviation of:

9 / 30

9. Free float is mainly used to:

10 / 30

10. Codes used in Nepal for building construction/design are:

11 / 30

11. The 1st stage of construction is:

12 / 30

12. Positive float can occur when it is:

13 / 30

13. In PERT technique, completion of an activity is called:

14 / 30

14. An EPC contract means:

15 / 30

15. Free float is the:

16 / 30

16. The constraint in the case of resource smoothing operation would be:

17 / 30

17. The interrelationship between the functional elements of a program is achieved through:

18 / 30

18. Railway projects are treated as:

19 / 30

19. No agreement is between:

20 / 30

20. Inspection of construction works for quality control is carried out and covers:

21 / 30

21. Completion of an activity on the CPM network diagram is generally known as:

22 / 30

22. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

23 / 30

23. In PERT analysis, the start and end of activity are represented by:

24 / 30

24. The meaning of modular coordination in construction is:

25 / 30

25. Of the following, the PERT event is:

26 / 30

26. A golden rule for the procurement of construction work suggests:

27 / 30

27. Performance security is necessary:

28 / 30

28. Which of the following is an activity in a CPM network:

29 / 30

29. A contractor can start the construction works following the receipt of:

30 / 30

30. The estimated time required to complete an activity is termed as:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top