Construction Management Online Test - Paper 2 » Quiz Test
GKaim: Measure | Improve | Achieve

Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Mobilization advance up to 10% of the cost of work is given to a contractor:

2 / 30

2. An example of a parallel activity is:

3 / 30

3. In PERT analysis, the time estimates of activities and the probability of their occurrence follow:

4 / 30

4. Type of organization used in the construction industry is:

5 / 30

5. The weakness in bar charts is:

6 / 30

6. Muster rolls are used for:

7 / 30

7. When the times of earliest finish and the latest finish are equal in an operation, the operation is called:

8 / 30

8. The maximum amount for the approval of tender by Gazetted 3rd class officer is:

9 / 30

9. Economic saving of time is obtained by crashing:

10 / 30

10. The mean of squared deviation from the mean of the distribution is known as:

11 / 30

11. If the probability factor is zero, the chances of completing the project in scheduled time are:

12 / 30

12. Negative slack occurs:

13 / 30

13. Codes used in Nepal for building construction/design are:

14 / 30

14. Henry Gantt developed the bar chart technique in:

15 / 30

15. The completion report includes:

16 / 30

16. Restraint is a restriction having:

17 / 30

17. The duration of time which an activity can be delayed without affecting the succeeding activity is called free float which affects only:

18 / 30

18. Force majeure in a contract is:

19 / 30

19. PERT is:

20 / 30

20. Indirect cost of the project:

21 / 30

21. Bar chart is used for minor projects, CPM is used for repetitive work while PERT is used for:

22 / 30

22. The time corresponding to the minimum total project cost is:

23 / 30

23. A dummy activity in CPM:

24 / 30

24. Total project cost:

25 / 30

25. Gantt chart indicates:

26 / 30

26. In PERT, the most likely time is:

27 / 30

27. Latest start time is the:

28 / 30

28. In PERT analysis, the actual performance of the task is known as:

29 / 30

29. Direct cost of a project is due to:

30 / 30

30. For the construction of a project, a contractor is a:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top