Construction Management Online Test - Paper 2 » Quiz Test
GK Aim: A Treasure of MCQs

Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Indirect cost of the project:

2 / 30

2. Military organization is known as:

3 / 30

3. Which of the following is an event in a CPM network:

4 / 30

4. In PERT technique, completion of an activity is called:

5 / 30

5. Codes used in Nepal for building construction/design are:

6 / 30

6. If, for an activity, the optimistic time is 1 day, pessimistic time is 11 days, and the most likely time is 3 days, then the expected time is:

7 / 30

7. Tender documents do not contain:

8 / 30

8. 'Wait' in CPM belongs to the category of:

9 / 30

9. Direct cost of a project is due to:

10 / 30

10. CPM adopts:

11 / 30

11. The relation between jobs of a particular type and various durations they have consumed for completion is expressed by:

12 / 30

12. Negative slack indicates:

13 / 30

13. Gantt chart indicates:

14 / 30

14. In CPM, the actual performance of a task is called:

15 / 30

15. A contractor can start the construction works following the receipt of:

16 / 30

16. Which of the following time estimates is related to PERT?

17 / 30

17. The total cost versus time curve of an activity is:

18 / 30

18. The figure indicates:

19 / 30

19. A stage or point where all previous jobs merging in it are completed and all further jobs bursting out are still to be completed is known as:

20 / 30

20. The interrelationship between the functional elements of a program is achieved through:

21 / 30

21. Critical path connecting the start and end events timewise is:

22 / 30

22. The scheduled completion time of an operation in CPM chart is mentioned on:

23 / 30

23. If a is the optimistic time, b is the pessimistic time, and m is the most likely time, then the average time is equal to:

24 / 30

24. The number of pre-operations associated with an operation may be:

25 / 30

25. The minimum number of consulting firms for the direct purchase of services is:

26 / 30

26. Updating may result in:

27 / 30

27. In resource leveling, the main constraint would be:

28 / 30

28. The duration of time which an activity can be delayed without affecting the succeeding activity is called free float which affects only:

29 / 30

29. The minimum number of critical paths in a network should be:

30 / 30

30. Which of the following techniques is advanced and more indicative in modern construction progress review?

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top