Construction Management Online Test - Paper 2 » Quiz Test

Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. In PERT analysis, the time estimates of activities and the probability of their occurrence follow:

2 / 30

2. Mobilization advance up to 10% of the cost of work is given to a contractor:

3 / 30

3. Force majeure in a contract is:

4 / 30

4. An event is indicated on the network by a number enclosed in:

5 / 30

5. The upper portion of horizontal bars in a bar chart indicates:

6 / 30

6. The 1st stage of construction is:

7 / 30

7. PERT is:

8 / 30

8. Line of balance technique is used for:

9 / 30

9. Line & staff organization is mostly suitable for:

10 / 30

10. Construction team means:

11 / 30

11. The maximum amount of project cost after the price adjustment should not exceed:

12 / 30

12. Choose the incorrect statement:

13 / 30

13. Codes used in Nepal for building construction/design are:

14 / 30

14. In PERT analysis, the start and end of activity are represented by:

15 / 30

15. The Force Account or AMANAT, a method of carrying out the construction work is done by:

16 / 30

16. In CPM method, the earliest finish is indicated by time on:

17 / 30

17. If an activity has its optimistic, most likely, and pessimistic times as 2, 4, and 6, respectively, then its expected time and variance are respectively:

18 / 30

18. Float is:

19 / 30

19. Railway projects are treated as:

20 / 30

20. For the construction of a project, a contractor is a:

21 / 30

21. For a safe working environment in the working site, "Tool Box Talk" is conducted:

22 / 30

22. Free float for any activity is defined as the difference between:

23 / 30

23. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

24 / 30

24. The number of pre-operations associated with an operation may be:

25 / 30

25. Critical path is:

26 / 30

26. The constraint in the case of resource smoothing operation would be:

27 / 30

27. Total project cost:

28 / 30

28. The time below which the duration cannot be further reduced is known as:

29 / 30

29. Critical path:

30 / 30

30. On a bar chart, the various activities of a project are shown by:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments