Construction Management Online Test - Paper 2 » Quiz Test
GKaim: Measure | Improve | Achieve

Construction Management Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Latest start of the activity is always:

2 / 30

2. Probability factor in PERT is given by:

3 / 30

3. Latest finish time in CPM technique is indicated by:

4 / 30

4. The difference between total float and free float is called interfering float which is nothing but the:

5 / 30

5. In CPM method, the earliest finish is indicated by time on:

6 / 30

6. Total project cost:

7 / 30

7. In a CPM/PERT network, the number of events is:

8 / 30

8. Total cost of the project is:

9 / 30

9. If D is the duration, ES and EF are the earliest start and earliest finish time, LS and LF are the latest start and latest finish time, then the following relation holds good:

10 / 30

10. The independent float affects only:

11 / 30

11. The meaning of modular coordination in construction is:

12 / 30

12. Which of the following is an activity in a CPM network:

13 / 30

13. The estimated time required to complete an activity is termed as:

14 / 30

14. The difference between the total float and the free float is termed as:

15 / 30

15. Type of organization used in the construction industry is:

16 / 30

16. Military organization is known as:

17 / 30

17. The relation between jobs of a particular type and various durations they have consumed for completion is expressed by:

18 / 30

18. A construction schedule is prepared after collecting:

19 / 30

19. Line of balance technique is used for:

20 / 30

20. In PERT technique, completion of an activity is called:

21 / 30

21. Line organization is mostly suitable for:

22 / 30

22. In CPM:

23 / 30

23. Indirect cost of the project:

24 / 30

24. In resource leveling, the main constraint would be:

25 / 30

25. CPM network is:

26 / 30

26. The interrelationship between the functional elements of a program is achieved through:

27 / 30

27. A project is:

28 / 30

28. An example of a parallel activity is:

29 / 30

29. The mean of squared deviation from the mean of the distribution is known as:

30 / 30

30. 'Wait' in CPM belongs to the category of:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top