Estimating & Costing Online Test - Paper 3 » Ultimate Challenge

Estimating & Costing Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The chairman of the material rate fixation committee in the district is

2 / 50

2. The number of corrugations in an asbestos cement sheet is usually

3 / 50

3. The weight of cement in one bag is

4 / 50

4. Estimate is

5 / 50

5. Minimum size of the pipe connected to the septic tank is

6 / 50

6. If the payment of annuity begins after some years in the future, it is known as

7 / 50

7. In the case of a roof truss made of steel, rivets, bolts, nuts, etc., normally account for

8 / 50

8. The unit rate of items written by the contractor in BOQ is in numeral as well as alphabetical form. Which one is preferred?

9 / 50

9. In the long and short wall method of estimation, the length of the long wall is the center to center space between walls plus

10 / 50

10. The order of booking dimension is:

11 / 50

11. Payment of the steel is done by

12 / 50

12. The thickness of slabs and beams must be measured to the nearest

13 / 50

13. The amount of cement required per cubic meter having mix (1:3:6) is

14 / 50

14. A layer of dry bricks put below the foundation concrete, in the case of soft soils, is called

15 / 50

15. The unit of measurement for earthwork in excavation in ordinary soils, earthwork in mixed soil with kankar, bajri, etc., when the depth of excavation does not exceed 30 cm, is

16 / 50

16. The most reliable estimate is:

17 / 50

17. The gradual accumulation of amounts by way of annual periodic deposits, which is meant for the replacement of the structure at the end of its useful life period, is known as

18 / 50

18. During the calculation of RCC, the amount of steel deducted is

19 / 50

19. In which of the following works, the work turned in cu.m per mason per day will be the least?

20 / 50

20. The amount of money deposited along with the submission of tender is known as

21 / 50

21. A document containing a detailed description of all types of work (but their quantities are not mentioned) together with their current rates is called

22 / 50

22. Which of the following is not a common size of reinforcement bars?

23 / 50

23. Plinth area of a building does not include:

24 / 50

24. Centre line method is specially adopted for estimating... Buildings.

25 / 50

25. The unit of payment for excavation trenches for pipes, cables, etc., up to 1.5 m depth in ordinary rock/hard rock is

26 / 50

26. The quantity of work of any item which is the output of a skilled labor in a day is known as

27 / 50

27. Which of the following is not considered while preparing the item rate estimate?

28 / 50

28. According to ISI method of measurement, the order of sequence is:

29 / 50

29. The building material brick

30 / 50

30. The number of skilled and unskilled manpower required for the fabrication of one metric ton steel (Norms prepared by DoR) is

31 / 50

31. Which of the following is not an essential part of the general specification of public works?

32 / 50

32. The volume of concrete for a reinforced concrete isolated sloped footing with top and bottom areas equal to A1 and A2 and with a height equal to h is given by:

33 / 50

33. Providing and assembling in position false work for the construction of RCC superstructure is measured in:

34 / 50

34. The rate of an item of work depends

35 / 50

35. The portion which is wrongly excavated by the contractor is to be filled

36 / 50

36. Of the total estimated cost of a building, the cost of electrification usually accounts for

37 / 50

37. The unit of payment for roadside brick edging to increase the pavement width is

38 / 50

38. Following items of earthwork are not measured separately

39 / 50

39. The full form of VAT is

40 / 50

40. Due to a change in the price level, a revised estimate is prepared if the sanctioned estimate exceeds:

41 / 50

41. When additional works are added to the original works, the estimate is called:

42 / 50

42. For brick construction, the lime-sand mortar is

43 / 50

43. Volume is measured correct to the nearest:

44 / 50

44. Normally which one contract gives the maximum value of the project

45 / 50

45. Bill of quantities is prepared based on:

46 / 50

46. Contractor profit is added to

47 / 50

47. Demolition means

48 / 50

48. In CGI sheet roofing, the overlap along the length of the sheet should not be less than?

49 / 50

49. The standard width of the galvanized iron sheet is

50 / 50

50. In the case of unsewered areas, an additional provision for a septic tank is usually

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top