Estimating & Costing Online Test - Paper 3 » Ultimate Challenge
GK Aim: A Treasure of MCQs

Estimating & Costing Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. Minimum size of the pipe connected to the septic tank is

2 / 50

2. The concealed faces of the frames of doors and windows are painted with

3 / 50

3. If the payment of annuity begins after some years in the future, it is known as

4 / 50

4. According to ISI method of measurement, the order is in the sequence

5 / 50

5. To account for the corrugation, the plain area of the semi-corrugated asbestos sheet is increased by (for whitewashing)

6 / 50

6. The unit of PVC pipe used in water supply pipeline is

7 / 50

7. Evaluation of building is done based on

8 / 50

8. The unit of measurement for woodwork in door and window frame, rafters, beams, roof trusses, etc., is

9 / 50

9. In the specification of earthwork in foundation trenches, drains, etc. lead specified is (IS code)

10 / 50

10. The unit of measurement for concrete work in R.C.C. is

11 / 50

11. Specification is the

12 / 50

12. Rate analysis prepared by the ministry of transport and work includes

13 / 50

13. In the case of steel rolling shutters, for the estimation of the painted area, the plain area is multiplied by

14 / 50

14. The types of work done by the use of labor but not material, equipment, etc., are known as:

15 / 50

15. For small residential buildings, the cost installation and electrification are made as:

16 / 50

16. If the payment of annuity begins after some years in future, it is known as

17 / 50

17. Which of the following is not considered while preparing the item rate estimate?

18 / 50

18. The unit of measurement for steel works in trussed and its parts is

19 / 50

19. The thickness of slabs and beams must be measured to the nearest

20 / 50

20. The unit of payment for roadside brick edging to increase the pavement width is

21 / 50

21. The value of the property or structures becomes less by its becoming out of date in style is known as

22 / 50

22. When engineering departments undertake the works of other departments, the amount charged toward design, supervision, and execution, etc., is called

23 / 50

23. Tender does not contain

24 / 50

24. The actual size of the modular brick (as per IS Code) is

25 / 50

25. Which of the following is not a common size of reinforcement bars?

26 / 50

26. A layer of dry bricks put below the foundation concrete, in the case of soft soils, is called

27 / 50

27. In the long and short wall method of estimation, the length of the long wall is the center to center space between walls plus

28 / 50

28. Carpet area does not include the area of

29 / 50

29. Of the total estimated cost of a building, the cost of electrification usually accounts for

30 / 50

30. The number of corrugations in a galvanized corrugated sheet is usually

31 / 50

31. In a sanitary pipeline for 3 m length, how many skilled labor are required

32 / 50

32. During the calculation of RCC, the amount of steel deducted is

33 / 50

33. End lap provided in asbestos cements is equal to

34 / 50

34. The gradual accumulation of amounts by way of annual periodic deposits, which is meant for the replacement of the structure at the end of its useful life period, is known as

35 / 50

35. For estimating painting area for iron grillwork over a door or window opening, the area measured will be:

36 / 50

36. In which of the following works, the work turned in cu.m per mason per day will be the least?

37 / 50

37. The area of the segmental portion of an arch with span I and rise r is approximately given by

38 / 50

38. When additional works are added to the original works, the estimate is called:

39 / 50

39. A document containing a detailed description of all types of work (but their quantities are not mentioned) together with their current rates is called

40 / 50

40. The document showing the account of work done or supply of material, including the particulars and quantities, is called

41 / 50

41. The unit of payment for fixing of glass panes or cleaning is in

42 / 50

42. The life of teak wood doors and windows is usually taken to be

43 / 50

43. Actual cost of construction plus certain profit is paid to the contractor. Such a contract is known as

44 / 50

44. Valuation is done for:

45 / 50

45. Working out the exact quantities of various items of work is known as

46 / 50

46. For electric wiring such as a fan, light, plug, etc., the estimate is made in terms of

47 / 50

47. The tender is:

48 / 50

48. The quantity of work of any item which is the output of a skilled labor in a day is known as

49 / 50

49. A fixed stipulated sum of penalty payable by the contractor having no relationship with real damage is known as

50 / 50

50. The unit of payment for excavation trenches for pipes, cables, etc., up to 1.5 m depth in ordinary rock/hard rock is

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top