Estimating & Costing Online Test - Paper 3 » Ultimate Challenge

Estimating & Costing Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The building material brick

2 / 50

2. Approximate weight of 1 cubic meter of sand is

3 / 50

3. The minimum space left from the property line (In Kathmandu valley) for the provision of window/door is

4 / 50

4. In the analysis of rates, what percentage of total cost is provided towards water charges?

5 / 50

5. When engineering departments undertake the works of other departments, the amount charged toward design, supervision, and execution, etc., is called

6 / 50

6. In the case of unsewered areas, an additional provision for a septic tank is usually

7 / 50

7. Centre line method is specially adopted for estimating... Buildings.

8 / 50

8. Carpet area does not include the area of

9 / 50

9. The amount of cement required per cubic meter having mix (1:3:6) is

10 / 50

10. The unit of measurement for electric wiring or electrification light, fan plug points is

11 / 50

11. The most reliable estimate is:

12 / 50

12. The method of valuation of a building as used by commercial banks is based on:

13 / 50

13. The essential requirements to prepare a good estimate are

14 / 50

14. The annual periodic payments made for the repayment of the capital invested are known as

15 / 50

15. Steel formwork can be used up to about.........times.

16 / 50

16. In the long and short wall method of estimation, the length of the long wall is the center to center space between walls plus

17 / 50

17. The unit of payment for fixing of glass panes or cleaning is in

18 / 50

18. The unit of measurement for concrete work in R.C.C. is

19 / 50

19. 1 British gallon=.........litres.

20 / 50

20. The measurement of steel grills is taken in terms of

21 / 50

21. The concealed faces of the frames of doors and windows are painted with

22 / 50

22. In the case of a roof truss made of steel, rivets, bolts, nuts, etc., normally account for

23 / 50

23. The amount of money deposited along with the submission of tender is known as

24 / 50

24. Indicating works left in excavated trenches to facilitate the measurement of borrow pits are known as

25 / 50

25. Which of the following is not a common size of reinforcement bars?

26 / 50

26. The information that can't be included in drawings is conveyed to the estimator through

27 / 50

27. The weight of 10 mm diameter mild steel rod per meter length is equal to

28 / 50

28. In the specification of earthwork in foundation trenches, drains, etc. lift ordinarily specified is

29 / 50

29. Valuation is done for:

30 / 50

30. The standard width of an asbestos cement corrugated sheet is

31 / 50

31. The number of corrugations in an asbestos cement sheet is usually

32 / 50

32. In a sanitary pipeline for 3 m length, how many skilled labor are required

33 / 50

33. Liquidated damage is directly related to

34 / 50

34. If the payment of annuity begins after some years in future, it is known as

35 / 50

35. A document showing the list of quantity of various items of works required for the completion of any project is known as

36 / 50

36. The unit of payment for A.C. sheet roofing is in

37 / 50

37. The estimated quantity of cement required in cement mortar (1:6) per cubic meter will be

38 / 50

38. A fixed stipulated sum of penalty payable by the contractor having no relationship with real damage is known as

39 / 50

39. The quantity of work of any item which is the output of a skilled labor in a day is known as

40 / 50

40. Whenever color washing on A.C. corrugated sheets is done, in the estimation, the plan area of the sheets is increased by

41 / 50

41. Actual cost of construction plus certain profit is paid to the contractor. Such a contract is known as

42 / 50

42. The tender is:

43 / 50

43. Rate analysis prepared by the ministry of transport and work includes

44 / 50

44. The value of the dismantled material less the cost of dismantling is called

45 / 50

45. In detailed measurement, the sequence of dimensions is written:

46 / 50

46. The nominal lead and lift allowed for the earthwork in the excavations of the foundations are

47 / 50

47. Specification is the

48 / 50

48. The number of standard bricks in one cubic meter of masonry is:

49 / 50

49. The value shown in the account book after allowing necessary depreciation is known as

50 / 50

50. Volume is measured correct to the nearest:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top