Estimating & Costing Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. The technique of finding the fair price of an existing building or property is known as

2 / 30

2. Following items of earthwork are not measured separately

3 / 30

3. The types of work done by the use of labor but not material, equipment, etc., are known as:

4 / 30

4. Indicating works left in excavated trenches to facilitate the measurement of borrow pits are known as

5 / 30

5. The concealed faces of the frames of doors and windows are painted with

6 / 30

6. When not specified, the volume of steel in R.C.C work is taken as

7 / 30

7. The annual periodic payments made for the repayment of the capital invested are known as

8 / 30

8. According to ISI method of measurement, the order is in the sequence

9 / 30

9. The unit of payment for excavation trenches for pipes, cables, etc., up to 1.5 m depth in ordinary rock/hard rock is

10 / 30

10. How many kilo-liters are in one cubic meter?

11 / 30

11. Which of the following is known as job overhead?

12 / 30

12. Specifications for the holdfasts are given in terms of

13 / 30

13. Volume is measured correct to the nearest:

14 / 30

14. The portion which is wrongly excavated by the contractor is to be filled

15 / 30

15. Specification is the

16 / 30

16. The essential requirements to prepare a good estimate are

17 / 30

17. In CGI sheet roofing, the overlap along the length of the sheet should not be less than?

18 / 30

18. The number of standard bricks in one cubic meter of masonry is:

19 / 30

19. Which of the following is the most correct estimate

20 / 30

20. Due to a change in the price level, a revised estimate is prepared if the sanctioned estimate exceeds:

21 / 30

21. 1 He=......Ropani.

22 / 30

22. The depreciation of the value of the building costs are generally not considered for the initial:

23 / 30

23. Steel formwork can be used up to about.........times.

24 / 30

24. When engineering departments undertake the works of other departments, the amount charged toward design, supervision, and execution, etc., is called

25 / 30

25. Which method is easiest for the estimation of the quantity of material?

26 / 30

26. Which one area must be greater at any floor of a building?

27 / 30

27. Which of the following is not an essential part of the general specification of public works?

28 / 30

28. The value shown in the account book after allowing necessary depreciation is known as

29 / 30

29. The unit of payment for fixing of glass panes or cleaning is in

30 / 30

30. As per norms prepared by the ministry of transport & works, one porter can carry a weight of

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Join Discussionsx
()
x
Scroll to Top