Highway Engineering Online Test - Paper 2 » Effective Exam
GK Aim: A Treasure of MCQs

Highway Engineering Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. Surface condition of pavement is measured by

2 / 30

2. The following types of pavement are generally known as flexible pavement:

3 / 30

3. An endoscope is used to determine

4 / 30

4. Cement grouted pavement is classified as

5 / 30

5. 10 to 20 cm diameter holes provided in a retaining structure to drain off the seepage flow are known as

6 / 30

6. The first stage of deciding the alignment of a hill road is

7 / 30

7. The city roads which are meant for through traffic usually on a continuous route are known as

8 / 30

8. The minimum thickness of the base course should be

9 / 30

9. Perception and brake reaction time depend upon

10 / 30

10. Compaction of a concrete slab is done with the help of

11 / 30

11. CBR (California Bearing Ratio) test is used for finding

12 / 30

12. While performing attrition and Los Angeles abrasion tests, the minimum weight of stones to be used should be

13 / 30

13. In cement concrete roads, the repair work of cracks should be done just at the end of:

14 / 30

14. Pick up the incorrect statement from the following

15 / 30

15. The minimum number of abutments in a bridge should be

16 / 30

16. Maximum thickness of otta seal is

17 / 30

17. The length of the vehicle has no effect on

18 / 30

18. In a gravel road, the binding material used is

19 / 30

19. The efficiency and life of a hill road can be considerably increased by providing

20 / 30

20. The concrete pavement is provided when the daily traffic load per lane exceeds

21 / 30

21. The steepest gradient in ordinary condition should not exceed

22 / 30

22. Cross ruts are formed along an earthen road because of

23 / 30

23. Calculate the super elevation for the cross-section of the road as shown below

24 / 30

24. On a W.B.M. road, the roller used for rolling purposes is of weight

25 / 30

25. The thickness of the road surfacing depends upon the

26 / 30

26. In the premix method of bitumen road construction, aggregate is also heated

27 / 30

27. When the width of the street and kerb parking space is limited, the system generally preferred is

28 / 30

28. Binder used in bituminous road is

29 / 30

29. The removal of material from the surface of the road by grinding or rubbing action is called

30 / 30

30. The grade separation has the advantage of

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top