Construction Management Online Test – Paper 1

0%
Created by 37fdd4228dab83e2f2bdee26b19f1560?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

  • Total Questions: 20
  • Time Allotted: 30 minutes
  • Passing Score: 40%
  • Randomization: No
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 20

1. Direct cost of a project is due to:

2 / 20

2. The total cost versus time curve of an activity is:

3 / 20

3. Assuming that the cost varies with time, the cost-slope is defined as:

4 / 20

4. The reduction in project time normally results in:

5 / 20

5. The direct cost of a project with respect to normal time is:

6 / 20

6. If the path of activities leads back into itself, the resulting error in the network is known as:

7 / 20

7. At an event other than the final event, if no activity emerges, it results in an error called:

8 / 20

8. In a CPM/PERT network, the number of events is:

9 / 20

9. Which of the following does not represent an activity?

10 / 20

10. Slack time in PERT analysis:

11 / 20

11. The square root of the variance is known as:

12 / 20

12. In PERT analysis, the time estimates of activities and the probability of their occurrence follow:

13 / 20

13. In PERT, the most likely time is:

14 / 20

14. In PERT, pessimistic time is:

15 / 20

15. In PERT, optimistic time is:

16 / 20

16. The pictorial representation of activities and events of a project is known as:

17 / 20

17. Updating may result in:

18 / 20

18. Policy is:

19 / 20

19. A construction schedule is prepared after collecting:

20 / 20

20. The most critical stage of construction is the construction of:

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Join Discussionsx
()
x
Scroll to Top