Estimating & Costing Online Test - Paper 2 » Success Quiz

Estimating & Costing Online Test – Paper 2

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 30
  • Time Allotted: 30 minutes
  • Passing Score: 50%
  • Randomization: Yes
  • Certificate: No
  • Do not refresh the page!
  • 👍 All the best!

1 / 30

1. How many kilo-liters are in one cubic meter?

2 / 30

2. The appropriate cost to the complete labor as a percentage of the total cost of the building is

3 / 30

3. If valuable properties are found during excavation, it becomes the property of

4 / 30

4. Contractor tax

5 / 30

5. When it is not specified, the number of holdfasts for a door is usually taken as

6 / 30

6. In a sanitary pipeline for 3 m length, how many skilled labor are required

7 / 30

7. Plinth area estimate is an approximate estimate mostly used for the estimation of:

8 / 30

8. Which of the followings is not an essential part of the general specification of public works?

9 / 30

9. When engineering departments undertake the works of other departments, the amount charged toward design, supervision, and execution, etc., is called

10 / 30

10. The types of work done by the use of labor but not material, equipment, etc., are known as:

11 / 30

11. The area of the segmental portion of an arch with span I and rise r is approximately given by

12 / 30

12. Following items of earthwork are not measured separately

13 / 30

13. The fundamental units in the metric system are:

14 / 30

14. As per norms prepared by the ministry of transport & works, one porter can carry a weight of

15 / 30

15. To account for the corrugation, the plain area of the semi-corrugated asbestos sheet is increased by (for whitewashing)

16 / 30

16. Rate analysis prepared by the ministry of transport and work includes

17 / 30

17. The process of calculating the amount of material, labor, and equipment for a unit of work together with overhead and profit for the contractor is:

18 / 30

18. The unit of payment for roadside brick edging to increase the pavement width is

19 / 30

19. The number of skilled and unskilled manpower required for the fabrication of one metric ton steel (Norms prepared by DoR) is

20 / 30

20. The essential requirements to prepare a good estimate are

21 / 30

21. In the analysis of rates, the profit and overhead for the contractor are generally taken as

22 / 30

22. Volume is measured correct to the nearest:

23 / 30

23. What is the minimum period for which the lime concrete in the foundation be left wet without the construction of masonry over it?

24 / 30

24. The value of the property or structures becomes less by its becoming out of date in style is known as

25 / 30

25. A fixed stipulated sum of penalty payable by the contractor having no relationship with real damage is known as

26 / 30

26. The value of the property (without being disassembled) at the end of the useful life period is known as

27 / 30

27. Dismantle means

28 / 30

28. Compound amount of Rs. 100 in 4 years @ 4% interest

29 / 30

29. The concealed faces of the frames of doors and windows are painted with

30 / 30

30. Which method is easiest for the estimation of the quantity of material?

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top