Construction Management Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. Muster rolls are used for:

2 / 50

2. The overall in-charge of an organization at the site responsible for the execution of works is:

3 / 50

3. Time and progress chart of construction is known as:

4 / 50

4. For the construction of a project, a contractor is a:

5 / 50

5. The 1st stage of construction is:

6 / 50

6. Military organization is known as:

7 / 50

7. In PERT analysis, the time estimates of activities and the probability of their occurrence follow:

8 / 50

8. The constraint in the case of resource smoothing operation would be:

9 / 50

9. The difference between total float and free float is called interfering float which is nothing but the:

10 / 50

10. Gantt chart is drawn for:

11 / 50

11. The amount of earnest money deposited at the time of submission of tender is:

12 / 50

12. The technique for establishing and maintaining priorities among various jobs of a project is known as:

13 / 50

13. Henry Gantt developed the bar chart technique in:

14 / 50

14. Slack time in PERT analysis:

15 / 50

15. Standard deviation when the optimistic time is 1 day, pessimistic time is 11 days, and most likely time is 3 days:

16 / 50

16. Whenever an activity has zero total float, then:

17 / 50

17. Jobs going ahead of schedule are conveniently shown in:

18 / 50

18. Line organization is mostly suitable for:

19 / 50

19. The estimated time required to complete an activity is termed as:

20 / 50

20. The cost corresponding to crash time is:

21 / 50

21. In CPM method, the earliest finish is indicated by time on:

22 / 50

22. A golden rule for the procurement of construction work suggests:

23 / 50

23. Total cost of the project is:

24 / 50

24. Float is:

25 / 50

25. The difference between the total float and the free float is termed as:

26 / 50

26. CPM adopts:

27 / 50

27. Indirect cost of the project:

28 / 50

28. The main responsibility of an overseer/Sub-Engineer is:

29 / 50

29. Negative float can occur when it is:

30 / 50

30. The main principle of an organization is:

31 / 50

31. The expected project duration in CPM follows:

32 / 50

32. Total project time is the:

33 / 50

33. PERT is:

34 / 50

34. Railway projects are treated as:

35 / 50

35. Of the following, the PERT event is:

36 / 50

36. In a CPM/PERT network, the number of events is:

37 / 50

37. An EPC contract means:

38 / 50

38. The post-operations in CPM are marked:

39 / 50

39. In CPM analysis:

40 / 50

40. Line & staff organization is mostly suitable for:

41 / 50

41. The final technical authority of a project is:

42 / 50

42. Force majeure in a contract is:

43 / 50

43. Tender documents do not contain:

44 / 50

44. The independent float affects only:

45 / 50

45. What are the key dates of a standard contracting procedure for a project?

46 / 50

46. The square root of the variance is known as:

47 / 50

47. An example of a parallel activity is:

48 / 50

48. Critical path connecting the start and end events timewise is:

49 / 50

49. Which of the following is an event in a CPM network:

50 / 50

50. If an activity has its optimistic, most likely, and pessimistic times as 2, 4, and 6, respectively, then its expected time and variance are respectively:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top
0
Join Discussionsx
()
x