Construction Management Online Test - Paper 3 » Quiz Test
GKaim: Measure | Improve | Achieve

Construction Management Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The maximum amount of project cost after the price adjustment should not exceed:

2 / 50

2. The term CPM in construction management is an abbreviation of:

3 / 50

3. If the completion time for a particular project is 6 weeks and its expected time is 8 weeks, then the slack time for the project is:

4 / 50

4. The minimum number of critical paths in a network should be:

5 / 50

5. Performance security is necessary:

6 / 50

6. Of the following, the PERT event is:

7 / 50

7. Mobilization advance up to 10% of the cost of work is given to a contractor:

8 / 50

8. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

9 / 50

9. Critical path connecting the start and end events timewise is:

10 / 50

10. In time cost optimization using CPM, the crashing of activities along the critical path is done starting with the activity having:

11 / 50

11. The expected project duration in CPM follows:

12 / 50

12. For the construction of a project, a contractor is a:

13 / 50

13. In CPM, the actual performance of a task is called:

14 / 50

14. The duration of time which an activity can be delayed without affecting the succeeding activity is called free float which affects only:

15 / 50

15. Military organization is known as:

16 / 50

16. Negative slack occurs:

17 / 50

17. Frederick W. Taylor introduced a system of working known as:

18 / 50

18. In CPM analysis:

19 / 50

19. Aggregate planning is planning for:

20 / 50

20. If an activity has its optimistic, most likely, and pessimistic times as 2, 4, and 6, respectively, then its expected time and variance are respectively:

21 / 50

21. Choose the incorrect statement:

22 / 50

22. The benefit of the PERT network is taken by the management in:

23 / 50

23. The weakness in bar charts is:

24 / 50

24. Which of the following is an activity in a CPM network:

25 / 50

25. The main advantage of line organization is:

26 / 50

26. CPM network is:

27 / 50

27. CPM adopts:

28 / 50

28. Time and progress chart of construction is known as:

29 / 50

29. Probability factor in PERT is given by:

30 / 50

30. Float is:

31 / 50

31. CPM family includes:

32 / 50

32. The mean of squared deviation from the mean of the distribution is known as:

33 / 50

33. Crashing of the project means:

34 / 50

34. If D is the duration, ES and EF are the earliest start and earliest finish time, LS and LF are the latest start and latest finish time, then the following relation holds good:

35 / 50

35. Policy is:

36 / 50

36. Which of the following is an event in a CPM network:

37 / 50

37. The main disadvantage of line organization is:

38 / 50

38. For a safe working environment in the working site, "Tool Box Talk" is conducted:

39 / 50

39. The dispute in construction is resolved through discussion of all parties on their respective stands leading to consensus. The process is called:

40 / 50

40. An example of a parallel activity is:

41 / 50

41. In a CPM/PERT network, the number of events is:

42 / 50

42. Total float for any activity is defined as the difference between:

43 / 50

43. If the height of the frequency-distribution underneath it is equal to unity, then the curve is known as:

44 / 50

44. Construction team means:

45 / 50

45. A construction schedule is prepared after collecting:

46 / 50

46. Total project time is the:

47 / 50

47. The constraint in the case of resource smoothing operation would be:

48 / 50

48. A milestone chart:

49 / 50

49. The scheduled completion time of an operation in CPM chart is mentioned on:

50 / 50

50. Gantt chart indicates:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Scroll to Top