Construction Management Online Test – Paper 3

0%
Created by 37fdd4228dab83e2f2bdee26b19f1560?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get New Questions in Each Attempt

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The activity that consumes maximum time is called:

2 / 50

2. A milestone chart:

3 / 50

3. Whenever an activity has zero total float, then:

4 / 50

4. The completion report includes:

5 / 50

5. Military organization is known as:

6 / 50

6. A project is:

7 / 50

7. In a CPM/PERT network, the number of events is:

8 / 50

8. Jobs going ahead of schedule are conveniently shown in:

9 / 50

9. Total float for any activity is defined as the difference between:

10 / 50

10. At an event other than the final event, if no activity emerges, it results in an error called:

11 / 50

11. Which of the following techniques is advanced and more indicative in modern construction progress review?

12 / 50

12. In PERT technique, completion of an activity is called:

13 / 50

13. In PERT analysis, the start and end of activity are represented by:

14 / 50

14. A contractor can start the construction works following the receipt of:

15 / 50

15. In time cost optimization using CPM, the crashing of activities along the critical path is done starting with the activity having:

16 / 50

16. Which of the following does not represent an activity?

17 / 50

17. The district rate finalizing committee does not include the representative of:

18 / 50

18. Latest finish time in CPM technique is indicated by:

19 / 50

19. A dummy activity in CPM:

20 / 50

20. The amount of money paid to the contractor by the client after the agreement and before the execution of work is known as:

21 / 50

21. The benefit of the PERT network is taken by the management in:

22 / 50

22. Crashing of the project means:

23 / 50

23. The Force Account or AMANAT, a method of carrying out the construction work is done by:

24 / 50

24. The pictorial representation of activities and events of a project is known as:

25 / 50

25. The time below which the duration cannot be further reduced is known as:

26 / 50

26. The owner gets assurance of work progress and quality from:

27 / 50

27. Which of the following is not a part of a contract agreement?

28 / 50

28. Free float is the:

29 / 50

29. If a is the optimistic time, b is the pessimistic time, and m is the most likely time, then the average time is equal to:

30 / 50

30. The direct cost of a project with respect to normal time is:

31 / 50

31. The minimum number of critical paths in a network should be:

32 / 50

32. Total cost of the project is:

33 / 50

33. Economic saving of time is obtained by crashing:

34 / 50

34. If an activity has its optimistic, most likely, and pessimistic times as 2, 4, and 6, respectively, then its expected time and variance are respectively:

35 / 50

35. Free float is mainly used to:

36 / 50

36. An event is:

37 / 50

37. In PERT, the most likely time is:

38 / 50

38. Standard deviation when the optimistic time is 1 day, pessimistic time is 11 days, and most likely time is 3 days:

39 / 50

39. The activity which neither takes time nor cost for its completion but is logically required to start the succeeding activity is known as:

40 / 50

40. The technique for establishing and maintaining priorities among various jobs of a project is known as:

41 / 50

41. Assuming that the cost varies with time, the cost-slope is defined as:

42 / 50

42. The interrelationship between the functional elements of a program is achieved through:

43 / 50

43. The cost corresponding to crash time is:

44 / 50

44. The occurrence of the starting of an activity is called its:

45 / 50

45. The figure indicates:

46 / 50

46. Latest start time is the:

47 / 50

47. On a bar chart, the various activities of a project are shown by:

48 / 50

48. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

49 / 50

49. Power stations are generally treated as:

50 / 50

50. Line of balance technique is used for:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Join Discussionsx
()
x
Scroll to Top