Construction Management Online Test – Paper 3

0%
Created by 83a36dcfd5c4caff12bc80f0020c9c749e12cbbbdb7c406dc1dd39996cb85836?s=32&d=monsterid&r=g gkaimVikash chaudhary

This is a FREE online test. Beware of scammers who ask for money to attend this test.

Get fresh, new questions in each attempt.

  • Total Questions: 50
  • Time Allotted: 50 minutes
  • Passing Score: 70%
  • Randomization: Yes
  • Certificate: Yes
  • Do not refresh the page!
  • 👍 All the best!

1 / 50

1. The salient feature of functional organization is:

2 / 50

2. The constraint in the case of resource smoothing operation would be:

3 / 50

3. The independent float affects only:

4 / 50

4. If the height of the frequency-distribution underneath it is equal to unity, then the curve is known as:

5 / 50

5. Which method is known as the minimum cost or maximum time schedule method:

6 / 50

6. In PERT, optimistic time is:

7 / 50

7. The reduction in project time normally results in:

8 / 50

8. Total cost of the project is:

9 / 50

9. The main disadvantage of line organization is:

10 / 50

10. The occurrence of the starting of an activity is called its:

11 / 50

11. Of the following, the PERT event is:

12 / 50

12. The weakness in bar charts is:

13 / 50

13. In a CPM/PERT network, the number of events is:

14 / 50

14. The time corresponding to the minimum total project cost is:

15 / 50

15. The dual-role event is:

16 / 50

16. In resource leveling, the main constraint would be:

17 / 50

17. According to Fulkerson's, the correct event numbers corresponding to events A, B, C, D, E of the network shown in figure 1 are:

18 / 50

18. Force majeure in a contract is:

19 / 50

19. The maximum amount for the approval of tender by Gazetted 3rd class officer is:

20 / 50

20. In CPM:

21 / 50

21. In PERT analysis, the actual performance of the task is known as:

22 / 50

22. The difference between total float and free float is called interfering float which is nothing but the:

23 / 50

23. Frederick W. Taylor introduced a system of working known as:

24 / 50

24. If a is the optimistic time, b is the pessimistic time, and m is the most likely time, then the average time is equal to:

25 / 50

25. CPM adopts:

26 / 50

26. When all the paths are arranged according to the descending order of the float, the path which is next to the critical path is known as:

27 / 50

27. No agreement is between:

28 / 50

28. The square root of the variance is known as:

29 / 50

29. Standard deviation when the optimistic time is 1 day, pessimistic time is 11 days, and most likely time is 3 days:

30 / 50

30. A stage or point where all previous jobs merging in it are completed and all further jobs bursting out are still to be completed is known as:

31 / 50

31. An example of a parallel activity is:

32 / 50

32. Aggregate planning is planning for:

33 / 50

33. If D is the duration, ES and EF are the earliest start and earliest finish time, LS and LF are the latest start and latest finish time, then the following relation holds good:

34 / 50

34. At an event other than the final event, if no activity emerges, it results in an error called:

35 / 50

35. Whenever an activity has zero total float, then:

36 / 50

36. An EPC contract means:

37 / 50

37. An event is:

38 / 50

38. Inspection of construction works for quality control is carried out and covers:

39 / 50

39. The interrelationship between the functional elements of a program is achieved through:

40 / 50

40. The amount of VAT for the purchase of steel having an amount of NRs. 6000/- should be:

41 / 50

41. Indirect cost of the project:

42 / 50

42. A frequency distribution curve:

43 / 50

43. In PERT, the most likely time is:

44 / 50

44. Gantt chart indicates:

45 / 50

45. Completion of an activity on the CPM network diagram is generally known as:

46 / 50

46. Line organization is mostly suitable for:

47 / 50

47. A golden rule for the procurement of construction work suggests:

48 / 50

48. The technique for establishing and maintaining priorities among various jobs of a project is known as:

49 / 50

49. CPM network is:

50 / 50

50. Which of the following is an event in a CPM network:

Please provide accurate information so we can send your Achievement Certificate by mail.

Your score is

Share your achievement!

LinkedIn Facebook Twitter
0%

Please provide your feedback.

Thank you for your valuable feedback.

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
Scroll to Top